SunForce Energy — Spring Solar Wiki
SunForce × Spring Solar · Training & SOPs
Spring Solar Wiki

Knowledge base for working with Spring Solar — process, equipment, pricing, partners, and field standards.

⚙️
Wiki is being populated. Sections marked AWAITING will fill in as Spring Solar's training docs are added. Reach out to the Spring Solar fulfillment team for current SOPs in the meantime.
01

Welcome & Overview

Awaiting
📖

Spring Solar's overview, mission, and history will live here. Share the welcome doc and we'll populate.

02

Working With Spring Solar

Partial

Spring Solar is your turn-key fulfillment partner. They handle design, engineering, procurement, installation, city inspections, and permitting on every job. Your role as the rep is to close, hand off the deal, and stay in the customer's life as their point of confidence.

Spring Solar's stated #1 priority: "a 5-star customer experience — make that as #1, and referrals will come."

Detailed rep-to-fulfillment workflow, communication channels, escalation paths, and weekly cadence will be added as training docs are shared.

Source · Spring Solar Adders Sheet (March 2026) · awaiting full SOPs
03

Standard Equipment

Active

What ships on every standard install — no upgrades required, no adders charged.

Default Panels Talesun 400W — Black on Black, UL Listed
Default Inverters APsystems DS3-L Microinverters
Inverter Warranty 25 Years (standard)
Workmanship Warranty 10 Years (included)

Optional Upgrades

  • REC 460 panels — $0.38/W premium upgrade
  • Hyundai 440 panels — $0.15/W mid-tier upgrade
  • Enphase IQ 8+ inverters — $0.15/W adder, 25-yr warranty
  • APsystems extended warranty — $15/panel to extend to 25 yr
  • Sol-Ark Hybrid — for battery-backed systems, contact for pricing
  • Solar Insure 30-yr bumper-to-bumper — $0.10/W

Battery options (Tesla Powerwall 3, EG4, Sonnen, Encharge, Delta Pro line, Fortress / Franklin, APsystems 11kW) are documented in the Adders Database.

🗂️ Open Adders Database Full pricing for every panel, inverter, and battery option. Source · Spring Solar Adders Sheet · March 2026
04

Install Process

Active

Standard timeline from signed agreement to system live. Most projects: 6–10 weeks start to finish.

01
Day 1
Docs Signed & Credit Approval
Customer signs the agreement. Credit is processed (soft pull). Project submitted to install team.
02
Week 1–2
Site Survey
Technician visits to inspect roof, electrical panel, attic space, and meter. Photos captured for engineering.
03
Week 2–3
Engineering Design
Custom layout: panel placement, inverter location, wiring diagram, structural load calculations.
04
Week 3–5
City Permits
Permit package submitted to municipality. Spring Solar handles all paperwork.
05
The Big Day
Installation
Typically 1–2 days. Panels mounted, inverter installed, wiring run, site cleaned.
06
Post-Install
Inspections
City inspector verifies code compliance. Spring Solar coordinates the visit.
07
Final Step
Permission to Operate (PTO)
Utility issues PTO. System turns on, net metering activates. Customer is live.
Source · Standard install workflow · full process docs awaiting
05

Site Surveys & Photos

Partial

The site survey is the first physical step after credit approval. Photos, measurements, and panel/meter inspection inform the engineering design.

Two options: the rep captures the photos themselves, OR Spring Solar sends a tech.

Spring Solar — SLV $150 site survey adder
Spring Solar — outside SLV / Utah Co $200 site survey adder
Rep does it themselves $0 — no adder

Photo checklist, room-by-room shot list, and panel photo standards: awaiting Spring Solar's site survey training packet.

Source · Spring Solar Adders Sheet · checklist awaiting
06

Pricing & Adders

Active

Every adder, upgrade, and additional fee lives in the Adders Database.

Included in turn-key pricing — no charge:

  • Design, engineering, and procurement
  • Net meter application & installation
  • Installation labor
  • City inspection coordination
  • Monitoring hookup, layout, and homeowner setup
  • 10-year workmanship warranty
  • Up to $500 in city permitting costs
🗂️ Adders Database 73 adders priced and categorized — live, searchable, filterable. Source · Spring Solar Adders Sheet · March 2026
07

Service Area & Travel

Active

Spring Solar's home base and service zones determine when travel adders apply.

Home Base Bluffdale, UT
Standard Radius 45 miles — no travel adder
Beyond 45 mi $13 / mile
St. George area $0.15 / W (separate tier)
Battery installs — beyond 45 mi +$5 / mile (on top of standard travel)
Wyoming installs Separate pricing · Wyoming MPU $3,500
Source · Spring Solar Adders Sheet · March 2026
08

Permitting Quick Reference

Active

City-specific permitting quirks. Most are baked into the standard process — flag the ones below to set customer expectations early.

  • City permit cost coverage: Spring Solar covers up to $500. Anything over is a pass-through to the customer.
  • Common overage cities: Ogden, Weber County, Provo, Taylorsville — expect to charge above the cap.
  • Sandy City: Load calculations required on every job ($150) unless a new MPU is being installed.
  • Riverton & Saratoga Springs: Cities don't allow paneling over roof vent pipes. Vent redirect = $150 / vent pipe.
  • Eagle Mountain: Critter Guard required by city ($35 / panel).
Source · Spring Solar Adders Sheet · March 2026
09

Customer Experience Standards

Partial

"We strive for a 5 star customer experience, so please make that as #1, and referrals will come!!!"

— Spring Solar Fulfillment, March 2026

The 5-star bar is non-negotiable. Don't promise things outside scope — if you do and equipment ships, Spring Solar will charge stocking + trip fees. Example: promising GoalZero ties directly to the solar system when it doesn't.

Detailed CX SOPs (talking points, escalation, post-install touchpoints, NPS targets) awaiting full training docs.

Source · Spring Solar Adders Sheet · full CX SOPs awaiting
10

Financing Partners

Partial

Financing platforms used to fund Spring Solar deals. Confirm which is active before submitting.

🏦 Credit Human Loan applications, approvals, and customer credit status.

Other partners (Sungage, Grid Plus, etc.) and the rep playbook for which to use when: awaiting financing training packet.

Source · SunForce Rep Portal · full partner matrix awaiting
11

Contact & Escalation

Awaiting
📞

Spring Solar fulfillment contacts, slack channels, and escalation paths will live here. Share the contact sheet to populate.

SunForce Energy · Spring Solar Wiki
Internal Use Only · Living Document · v0.1